Locks substation interconnection queue
1 active project totalling 0.2 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
0.2active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-259 | Locks 34.5 kV | 34.5 | 15 | Solar | Withdrawn |
| AF2-108 | Locks 34.5 kV | 34.5 | 10 | Hybrid | Withdrawn |
| AC1-061 | Dinwiddie 2 | 34.5 | 0.2 | Hybrid | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.