Washington, NC interconnection queue
8 active projects totalling 698.7 MW in the PJM queue, plus 13 with terminal status (shown greyed).
8active projects
698.7active MW
21total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-431 | Mackeys 230 kV | 230 | 266.2 | Solar | Withdrawn |
| AG1-431A | Mackeys 230 kV | 230 | 200 | Battery | Withdrawn |
| AD1-074 | Macadamia Solar | 230 | 198.8 | Solar | Engineering and Procurement |
| C01-1556 | Creswell 115 kV | 115 | 190 | Battery | Active |
| AF1-073 | Trowbridge 230 kV | 230 | 120 | Solar | Withdrawn |
| AF2-047 | Creswell-Riders Creek 115 kV | 115 | 99.8 | Solar | Withdrawn |
| AH1-040 | Mackeys - Creswell 115 kV | 115 | 90 | Solar | Active |
| AB2-189 | Mackeys 230kV | 230 | 84 | Solar | Withdrawn |
| AD1-076 | Macadamia Solar | 230 | 72.2 | Solar | Engineering and Procurement |
| AH1-436 | Mackeys- Creswell 115kV | 115 | 60 | Battery | Withdrawn |
| AA2-178 | Ablemarle Beach Solar | 230 | 56 | Solar | In Service |
| AA2-179 | Creswell-Mackeys 115kV | 115 | 56 | Solar | Withdrawn |
| AD2-195 | Trowbridge-Pantero 115 kV | 115 | 55.9 | Solar | Withdrawn |
| AD1-075 | Macadamia Solar | 230 | 49.7 | Solar | Engineering and Procurement |
| AE2-034 | Albemarle Beach Solar | 230 | 42 | Solar | Partially in Service - Under Construction |
| W3-053 | Trowbridge 230kV | 230 | 33.8 | Wind | Withdrawn |
| Y1-043 | Mackeys-Creswell 115kV | 115 | 19.5 | Wind | Withdrawn |
| AB2-188 | Creswell 34.5kV | 34.5 | 14 | Solar | Withdrawn |
| AH1-035 | Plymouth 34.5 kV | 34.5 | 13.5 | Solar | Withdrawn |
| AG2-121 | Mackeys 230 kV | 230 | 0 | Battery | Active |
| X1-067 | Plymouth | n/r | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.