Substation Scout

Washington, NC interconnection queue

6 active projects totalling 508.7 MW in the PJM queue, plus 15 with terminal status (shown greyed).

6active projects
508.7active MW
21total filed
Queue IDProjectkVMWResourceStatus
AG1-431 Mackeys 230 kV 230 266.2 Solar Withdrawn
AG1-431A Mackeys 230 kV 230 200 Battery Withdrawn
AD1-074 Macadamia Solar 230 198.8 Solar Engineering and Procurement
C01-1556 Creswell 115 kV 115 190 Battery Withdrawn
AF1-073 Trowbridge 230 kV 230 120 Solar Withdrawn
AF2-047 Creswell-Riders Creek 115 kV 115 99.8 Solar Withdrawn
AH1-040 Mackeys - Creswell 115 kV 115 90 Solar Active
AB2-189 Mackeys 230kV 230 84 Solar Withdrawn
AD1-076 Macadamia Solar 230 72.2 Solar Engineering and Procurement
AH1-436 Mackeys- Creswell 115kV 115 60 Battery Withdrawn
AA2-178 Ablemarle Beach Solar 230 56 Solar In Service
AA2-179 Creswell-Mackeys 115kV 115 56 Solar Withdrawn
AD2-195 Trowbridge-Pantero 115 kV 115 55.9 Solar Withdrawn
AD1-075 Macadamia Solar 230 49.7 Solar Engineering and Procurement
AE2-034 Albemarle Beach Solar 230 42 Solar Partially in Service - Under Construction
W3-053 Trowbridge 230kV 230 33.8 Wind Withdrawn
Y1-043 Mackeys-Creswell 115kV 115 19.5 Wind Withdrawn
AB2-188 Creswell 34.5kV 34.5 14 Solar Withdrawn
AH1-035 Plymouth 34.5 kV 34.5 13.5 Solar Withdrawn
AG2-121 Mackeys 230 kV 230 0 Battery Withdrawn
X1-067 Plymouth n/r 0 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.