Mackeys substation interconnection queue
2 active projects totaling 98 MW in the PJM queue, plus 5 with terminal status (shown grayed).
7 PJM queue filings name Mackeys as the point of interconnection, all in NC.
Target commercial operation dates as filed run from Jun 2017 to Dec 2027 (7 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (1 filing).
2active projects
98active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-236 | Mackeys 230 kV | 230 | 459.8 | Solar | Withdrawn | Sep 2024 |
| AG1-431 | Mackeys 230 kV | 230 | 266.2 | Solar | Withdrawn | Dec 2024 |
| AG1-431A | Mackeys 230 kV | 230 | 200 | Battery | Withdrawn | Dec 2024 |
| AB2-189 | Mackeys 230kV | 230 | 84 | Solar | Withdrawn | Jun 2017 |
| AA2-178 | Ablemarle Beach Solar | 230 | 56 | Solar | In Service | Apr 2021 |
| AE2-034 | Albemarle Beach Solar | 230 | 42 | Solar | Partially in Service - Under Construction | Dec 2026 |
| AG2-121 | Mackeys 230 kV | 230 | 0 | Battery | Withdrawn | Dec 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | AG2-121 | Terminal status | 0 | Active → Withdrawn |
Other PJM queue substations in Tyrell County, NC
- Riders Creek: none active of 3 filed
Other PJM queue substations in Washington County, NC
- Trowbridge: 3 active, 320.7 MW of 5 filed
- Plymouth: none active of 3 filed
- Creswell: none active of 2 filed
Site Scanner