Trowbridge substation interconnection queue

3 active projects totaling 320.7 MW in the PJM queue, plus 2 with terminal status (shown grayed).

5 PJM queue filings name Trowbridge as the point of interconnection, all in Washington County, NC.

Target commercial operation dates as filed run from Sep 2013 to Mar 2028 (5 filings). 3 active filings target a date after November 27, 2026.

3active projects
320.7active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AD1-074 Macadamia Solar 230 198.8 Solar Engineering and Procurement Mar 2028
AF1-073 Trowbridge 230 kV 230 120 Solar Withdrawn Oct 2021
AD1-076 Macadamia Solar 230 72.2 Solar Engineering and Procurement Mar 2028
AD1-075 Macadamia Solar 230 49.7 Solar Engineering and Procurement Mar 2028
W3-053 Trowbridge 230kV 230 33.8 Wind Withdrawn Sep 2013

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Washington County, NC

All 21 PJM queue filings in Washington County, NC.