Creswell substation interconnection queue

1 active project totalling 190 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
190active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1556 Creswell 115 kV 115 190 Battery Active
AB2-188 Creswell 34.5kV 34.5 14 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.