Tyler substation interconnection queue
1 active project totaling 12 MW in the PJM queue, plus 4 with terminal status (shown grayed).
5 PJM queue filings name Tyler as the point of interconnection, all in Chesterfield County, VA.
Target commercial operation dates as filed run from Dec 2022 to Jun 2027 (5 filings). 1 active filing targets a date after November 27, 2026.
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-276 | Tyler 230 kV | 230 | 150 | Battery | Withdrawn | Dec 2023 |
| AE2-228 | Bradley BridgeSolar | 34 | 12 | Solar | Withdrawn | Mar 2025 |
| AF1-291 | Chester Solar Technology Park | 34.5 | 12 | Solar | Engineering and Procurement | Jun 2027 |
| AF2-256 | Bradley Bridge Solar | 34.5 | 3 | Solar | Withdrawn | Nov 2023 |
| AF2-257 | Tyler 34.5 kV | 34.5 | 3 | Solar | Withdrawn | Dec 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Tyler” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
Other PJM queue substations in Chesterfield County, VA
- Chesterfield: 8 active, 1,240 MW of 11 filed
- Basin - Chesterfield: 2 active, 545 MW of 2 filed
- Midlothian: 4 active, 282 MW of 5 filed
- Harrowgate-Locks: 1 active, 72 MW of 2 filed
- Winterpock: 3 active, 44.5 MW of 3 filed
- Harrowgate: 1 active, 12 MW of 2 filed
- Locks: 1 active, 0.2 MW of 3 filed
- Iron Bridge: none active of 3 filed