21 active projects totalling 2,439.7 MW in the PJM queue, plus 20 with terminal status (shown greyed).

21active projects
2,439.7active MW
41total filed
Queue IDProjectkVMWResourceStatus
X2-082 Chesterfield 230kV 230 1,420 Gas Withdrawn
AF1-128 Chesterfield CT Units 1 and 2 230 569 Gas UC
AF1-129 Chesterfield CT Units 3&4 230 569 Gas Engineering and Procurement
C01-2171 Basin - Chesterfield 230 kV 230 425 Nuclear Active
AG2-646 Chesterfield 230 kV 230 200 Battery Withdrawn
C01-1682 Bellwood - Brown Boveri Tap 115 kV 115 200 Battery Active
AG2-088 Midlothian 230 kV 230 150 Battery Active
AG2-269 Chesterfield 230 kV 230 150 Battery Withdrawn
AG2-275 Southwest 230 kV 230 150 Battery Withdrawn
AG2-276 Tyler 230 kV 230 150 Battery Withdrawn
C01-1543 Basin - Chesterfield 230 kV 230 120 Battery Active
AI1-107 Midlothian - North Pole 230 kV 230 100 Battery Withdrawn
C01-1292 Midlothian 230 kV 230 100 Battery Active
AE1-232 Harrowgate-Locks 115 kV 115 72 Solar Withdrawn
AE2-027 Chester Solar 115 72 Solar Suspended
AH1-365 Iron Bridge 230kV 230 50.4 Battery Withdrawn
C01-2216 Harrowgate - Locks 115 kV 115 44.2 Solar Active
AH2-056 Chesterfield 230 kV II 230 36 Battery Withdrawn
AH1-259 Chesterfield- Centralia 115kV 115 35 Battery Withdrawn
S79 Chesterfield Unit #6 230 27 Coal In Service
AG2-384 Chesterfield 230 kV 230 24 Battery Active
AF2-085 Dry Bridge Energy Center 34.5 20 Battery In Service
S80 Chesterfield Unit #5 230 20 Coal In Service
R63 Chesterfield Unit #5 230 19 Coal In Service
AH1-106 360 Solar Center, LLC 34.5 15.6 Solar Active
AH1-107 360 Solar Center, LLC 34.5 15.6 Solar Active
AF2-259 Locks 34.5 kV 34.5 15 Solar Withdrawn
AC2-131 Chesterfield 230kV 7 230 14.3 Gas Withdrawn
AE1-074 Winterpock I 34.5 13.3 Solar Partially in Service - Under Construction
AC2-130 Chesterfield Unit 5 230 13.2 Coal Deactivated
AE2-212 Harrowgate 1 34 12 Solar Engineering and Procurement
AE2-227 Bradley Ridge Solar 34 12 Solar Withdrawn
AE2-228 Bradley BridgeSolar 34 12 Solar Withdrawn
AF1-291 Chester Solar Technology Park 34.5 12 Solar Engineering and Procurement
AC2-132 Chesterfield 230kV 8 230 8.8 Gas Withdrawn
C01-1087 Chesterfield 230 kV 230 6 Gas Active
C01-1088 Chesterfield 230 kV 230 6 Gas Active
AF2-255 Bradley Ridge Solar 34.5 3 Solar Withdrawn
AF2-256 Bradley Bridge Solar 34.5 3 Solar Withdrawn
AF2-257 Tyler 34.5 kV 34.5 3 Solar Withdrawn
AF2-258 Harrowgate 34.5 kV 34.5 3 Solar Withdrawn