Harrowgate-Locks substation interconnection queue
1 active project totaling 72 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Harrowgate-Locks as the point of interconnection, all in Chesterfield County, VA.
Target commercial operation dates as filed run from Dec 2021 to Oct 2027 (2 filings). 1 active filing targets a date after November 27, 2026.
1active projects
72active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE1-232 | Harrowgate-Locks 115 kV | 115 | 72 | Solar | Withdrawn | Dec 2021 |
| AE2-027 | Chester Solar | 115 | 72 | Solar | Suspended | Oct 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Chesterfield County, VA
- Chesterfield: 8 active, 1,240 MW of 11 filed
- Basin - Chesterfield: 2 active, 545 MW of 2 filed
- Midlothian: 4 active, 282 MW of 5 filed
- Winterpock: 3 active, 44.5 MW of 3 filed
- Tyler: 1 active, 12 MW of 5 filed
- Harrowgate: 1 active, 12 MW of 2 filed
- Locks: 1 active, 0.2 MW of 3 filed
- Iron Bridge: none active of 3 filed
Site Scanner