Iron Bridge substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Iron Bridge as the point of interconnection, all in Chesterfield County, VA.

Target commercial operation dates as filed run from Nov 2023 to Dec 2025 (3 filings).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-365 Iron Bridge 230kV 230 50.4 Battery Withdrawn Dec 2025
AE2-227 Bradley Ridge Solar 34 12 Solar Withdrawn Mar 2025
AF2-255 Bradley Ridge Solar 34.5 3 Solar Withdrawn Nov 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Iron Bridge” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Chesterfield County, VA

All 41 PJM queue filings in Chesterfield County, VA.