Substation Scout

Iron Bridge substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH1-365 Iron Bridge 230kV 230 50.4 Battery Withdrawn
AE2-227 Bradley Ridge Solar 34 12 Solar Withdrawn
AF2-255 Bradley Ridge Solar 34.5 3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.