Harrowgate substation interconnection queue

1 active project totalling 12 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
12active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE2-212 Harrowgate 1 34 12 Solar Engineering and Procurement
AF2-258 Harrowgate 34.5 kV 34.5 3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.