Substation Scout

Dinwiddie 2

PJM queue ID AC1-061

Dinwiddie 2 (AC1-061) is listed in the PJM interconnection queue as a 0.2 MW hybrid project in Dinwiddie County, VA. The filing names Locks as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2017.

Queue IDAC1-061
Project nameDinwiddie 2
Status (as published)In Service
SubstationLocks
Point of interconnectionLocks 34.5kV
CountyDinwiddie
StateVA
Voltage34.5 kV
Capacity0.2 MW
Resource (as published)Diesel; Methane
Resource categoryHybrid (normalized for filtering)
Target commercial operation2017-06-01
Source datasetserial

Same substation and county

Locks substation: 3 requests in the PJM queue, 1 active totaling 0.2 MW.

Queue IDProjectMWResourceStatus
AF2-259Locks 34.5 kV15SolarWithdrawn
AF2-108Locks 34.5 kV10HybridWithdrawn

Dinwiddie, VA: 20 requests in the PJM queue, 8 active totaling 2,405.2 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy0
MW capacity0.2
MFO3

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.