Winterpock substation interconnection queue
3 active projects totaling 44.5 MW in the PJM queue.
3 PJM queue filings name Winterpock as the point of interconnection, all in Chesterfield County, VA.
Target commercial operation dates as filed run from Jun 2026 to Oct 2027 (3 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: Dominion (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-106 | 360 Solar Center, LLC | 34.5 | 15.6 | Solar | Active | Oct 2027 |
| AH1-107 | 360 Solar Center, LLC | 34.5 | 15.6 | Solar | Active | Oct 2027 |
| AE1-074 | Winterpock I | 34.5 | 13.3 | Solar | In Service | Jun 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Winterpock (DOM, 1 mention).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-11-16 | AE1-074 | Status change | n/a | Partially in Service - Under Construction → In Service |
Other PJM queue substations in Chesterfield County, VA
- Chesterfield: 8 active, 1,240 MW of 11 filed
- Basin - Chesterfield: 2 active, 545 MW of 2 filed
- Midlothian: 4 active, 282 MW of 5 filed
- Harrowgate-Locks: 1 active, 72 MW of 2 filed
- Tyler: 1 active, 12 MW of 5 filed
- Harrowgate: 1 active, 12 MW of 2 filed
- Locks: 1 active, 0.2 MW of 3 filed
- Iron Bridge: none active of 3 filed