Winterpock substation interconnection queue

3 active projects totaling 44.5 MW in the PJM queue.

3 PJM queue filings name Winterpock as the point of interconnection, all in Chesterfield County, VA.

Target commercial operation dates as filed run from Jun 2026 to Oct 2027 (3 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: Dominion (2 filings).

3active projects
44.5active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-106 360 Solar Center, LLC 34.5 15.6 Solar Active Oct 2027
AH1-107 360 Solar Center, LLC 34.5 15.6 Solar Active Oct 2027
AE1-074 Winterpock I 34.5 13.3 Solar In Service Jun 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Winterpock (DOM, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-11-16AE1-074Status changen/a Partially in Service - Under Construction → In Service

Other PJM queue substations in Chesterfield County, VA

All 41 PJM queue filings in Chesterfield County, VA.