Eagle Point
PJM queue ID Y2-105
Eagle Point (Y2-105) is listed in the PJM interconnection queue as a 50 MW gas project in Gloucester County, NJ. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2016.
| Queue ID | Y2-105 |
|---|---|
| Project name | Eagle Point |
| Status (as published) | In Service |
| Substation | Eagle Point |
| Point of interconnection | Eagle Point 230kV |
| County | Gloucester |
| State | NJ |
| Voltage | 230 kV |
| Capacity | 50 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2016-06-01 |
| Source dataset | serial |
Same substation and county
Eagle Point substation: 5 requests in the PJM queue, 2 active totaling 72.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| X1-039 | Eagle Point | 22.9 | Gas | In Service |
| A16 | Eagle Point 230 kV | 800 | Gas | Withdrawn |
| W3-125 | Eagle Point 230kV | 27.9 | Gas | Withdrawn |
| H26 | Eagle Point 230kV | 25 | Gas | Withdrawn |
Gloucester, NJ: 88 requests in the PJM queue, 22 active totaling 1,788.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 63 |
| MW capacity | 50 |
| MFO | 253 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.