Enclave Solar Energy Center
PJM queue ID AE2-033
Enclave Solar Energy Center (AE2-033) is listed in the PJM interconnection queue as a 89 MW solar project in Sussex County, VA. The filing names Clubhouse-Sapony as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of February 1, 2030.
| Queue ID | AE2-033 |
|---|---|
| Project name | Enclave Solar Energy Center |
| Status (as published) | Engineering and Procurement |
| Substation | Clubhouse-Sapony |
| Point of interconnection | Clubhouse-Sapony 230 kV |
| County | Sussex |
| State | VA |
| Voltage | 230 kV |
| Capacity | 89 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2030-02-01 |
| Source dataset | serial |
Same substation and county
Clubhouse-Sapony substation: 2 requests in the PJM queue, 1 active totaling 89 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-266 | Clubhouse-Sapony 230 kV | 74.5 | Battery | Withdrawn |
Sussex, VA: 39 requests in the PJM queue, 14 active totaling 1,580.7 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-02 | Status change | n/a | Suspended → Engineering and Procurement |
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 149 |
| MW capacity | 89 |
| MFO | 149 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.