Enclave Solar Energy Center

PJM queue ID AE2-033

Enclave Solar Energy Center (AE2-033) is listed in the PJM interconnection queue as a 89 MW solar project in Sussex County, VA. The filing names Clubhouse-Sapony as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of February 1, 2030.

Queue IDAE2-033
Project nameEnclave Solar Energy Center
Status (as published)Engineering and Procurement
SubstationClubhouse-Sapony
Point of interconnectionClubhouse-Sapony 230 kV
CountySussex
StateVA
Voltage230 kV
Capacity89 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2030-02-01
Source datasetserial

Same substation and county

Clubhouse-Sapony substation: 2 requests in the PJM queue, 1 active totaling 89 MW.

Queue IDProjectMWResourceStatus
AF1-266Clubhouse-Sapony 230 kV74.5BatteryWithdrawn

Sussex, VA: 39 requests in the PJM queue, 14 active totaling 1,580.7 MW.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-02 Status change n/a Suspended → Engineering and Procurement

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy149
MW capacity89
MFO149

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first