Substation Scout

Blair, PA interconnection queue

3 active projects totalling 308.9 MW in the PJM queue, plus 12 with terminal status (shown greyed).

3active projects
308.9active MW
15total filed
Queue IDProjectkVMWResourceStatus
C01-1957 Claysburg 115 kV 115 289.3 Gas Active
AE2-264 Altoona-Raystown 230 kV 230 48 Solar Withdrawn
Q56 Claysburg 115kV 115 36 Wind Withdrawn
AI2-380 Altoona-Raystown 230 kV III 230 30.2 Solar Withdrawn
AG1-280 Claysburg-Puzzletown 46 kV 46 12 Solar Withdrawn
AG1-281 BL-Hileman Hollow 46 12 Solar Under Construction
Q53 Chestnut Flats WF 115 7.6 Wind In Service
AI2-055 Summit-West Fall 115kV II 115 6.8 Wind Withdrawn
W3-040 Martinsburg n/r 3.8 Gas Withdrawn
AF2-087 Antis Solar Facility 12.5 3.1 Solar Withdrawn
V2-002 Martinsburg n/r 2.7 Gas Withdrawn
AA1-115 Thirty First Street 115kV 115 0 Battery Withdrawn
AF2-271 BL-Kettle 12.5 0 Hybrid Withdrawn
AF2-272 BR-Swissdale 13.2 0 Hybrid Withdrawn
AG2-097 Altoona-Raystown 230 kV II 230 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.