BL-Diamond Bear Rocks

PJM queue ID AF1-140

BL-Diamond Bear Rocks (AF1-140) is listed in the PJM interconnection queue as a 9.8 MW solar project in Adams County, PA. The filing names Claysburg as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 31, 2026.

Queue IDAF1-140
Project nameBL-Diamond Bear Rocks
Status (as published)Suspended
SubstationClaysburg
Point of interconnectionClaysburg 23 kV
CountyAdams
StatePA
Voltage23 kV
Capacity9.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-12-31
Source datasetserial

Same substation and county

Claysburg substation: 3 requests in the PJM queue, 1 active totaling 9.8 MW.

Queue IDProjectMWResourceStatus
C01-1957Claysburg 115 kV289.3GasWithdrawn
Q56Claysburg 115kV36WindWithdrawn

Adams, PA: 86 requests in the PJM queue, 13 active totaling 2,270.3 MW.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Status change n/a Under Construction → Suspended

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy16.3
MW capacity9.78
MFO16.3

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.