Gary substation interconnection queue

2 active projects totalling 12.3 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
12.3active MW
4total filed
Queue IDProjectkVMWResourceStatus
AH1-656 Gary 115kV 115 48 Solar Withdrawn
AI2-256 Gary 115kV 115 20 Solar Withdrawn
C01-1889 Gary 25 kV 25 10.5 Solar Active
AH1-396 Gary 24.94 kV 24.9 1.8 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.