Substation Scout

Lunenburg, VA interconnection queue

8 active projects totalling 296.5 MW in the PJM queue, plus 13 with terminal status (shown greyed).

8active projects
296.5active MW
21total filed
Queue IDProjectkVMWResourceStatus
AI1-203 Clover - Rawling 500 kV 500 180 Solar Withdrawn
AG1-357 Clover-Rawlings 500 kV 500 120 Solar Withdrawn
C01-1183 Tunstall - Unity 230 kV 230 96.8 Solar Active
AD2-033 Red Brick Solar 115 78 Solar Under Construction
AG2-633 Gary DP - Lunenburg 115 kV 115 75 Solar Withdrawn
AI1-124 Nutbush - Victoria DP 115 kV 115 75 Solar Withdrawn
AG1-347 Briery DP-Clover 230 kV 230 56 Hybrid Withdrawn
AG2-634 Gary DP – Lunenburg 115 kV 115 50 Battery Withdrawn
AG2-213 Gary D.P Tap - Gary D.P 115 kV 115 48 Solar Active
AH1-656 Gary 115kV 115 48 Solar Withdrawn
AI2-222 Chase City-Lunenburg 115kV 115 47.8 Solar Withdrawn
AG2-171 Lunenburg - Nutbush 115 kV 115 36 Solar Active
AI1-123 Nutbush-Victoria DP 115kV 115 35.4 Solar Withdrawn
AH1-378 Victoria PV I, LLC 115 30.6 Solar Withdrawn
AI2-067 Lunenburg-Nutbush 115 kV 115 20 Solar Withdrawn
AI2-256 Gary 115kV 115 20 Solar Withdrawn
C01-2260 Lunenburg - Nutbush 115 kV 115 20 Solar Active
C01-1889 Gary 25 kV 25 10.5 Solar Active
AF2-372 Black Branch 34.5 kV 34.5 7.6 Solar Withdrawn
C01-1773 Nutbush 24.94 kV 24.9 5.4 Solar Active
AH1-396 Gary 24.94 kV 24.9 1.8 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.