Bridgeport 230 kV

PJM queue ID C01-2225

Bridgeport 230 kV (C01-2225) is listed in the PJM interconnection queue as a 300 MW project in Gloucester County, NJ. The filing names Bridgeport as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of May 1, 2030.

Queue IDC01-2225
Project nameBridgeport 230 kV
Status (as published)Active
SubstationBridgeport
Point of interconnectionBridgeport 230 kV
CountyGloucester
StateNJ
Voltage230 kV
Capacity300 MW
Resource (as published)Fuel Cell
Resource categoryOther (normalized for filtering)
Target commercial operation2030-05-01
Source datasetcycle

Same substation and county

Bridgeport substation: 4 requests in the PJM queue, 2 active totaling 519 MW.

Queue IDProjectMWResourceStatus
C01-2223Bridgeport 230 kV219BatteryActive
AG2-450Bridgeport 230 kV115.3BatteryWithdrawn
AH2-131Bridgeport 230kV103.7BatteryWithdrawn

Gloucester, NJ: 88 requests in the PJM queue, 22 active totaling 1,788.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperLunar Energy Center II, LLC
Transmission ownerAEC
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy300.0
MW capacity300.0
MFO300.0
Submitted date4/27/2026
Last updated6/18/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.