Black Oak - Hatfield substation interconnection queue
3 active projects totaling 1,491.1 MW in the PJM queue.
Target commercial operation dates as filed run from Mar 2029 to May 2031 (3 filings). 3 active filings target a date after November 27, 2026.
Transmission owner as filed: APS (3 filings).
3active projects
1,491.1active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1958 | Black Oak - Hatfield 500 kV | 500 | 931.1 | Gas | Active | May 2031 |
| C01-1333 | Black Oak - Hatfield 500 kV | 500 | 500 | Battery | Active | Dec 2030 |
| C01-1617 | Black Oak - Hatfield 500 kV | 500 | 60 | Battery | Active | Mar 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Fayette County, PA
- Hatfield - Rhodes Lane: 3 active, 4,038 MW of 3 filed
- Ronco: 2 active, 665 MW of 3 filed
- Gans - South Union: 1 active, 200 MW of 2 filed
- Lardin - Lake Lynn: 3 active, 119 MW of 3 filed
- Gans: 2 active, 98.1 MW of 4 filed
- Bethelboro: 1 active, 60 MW of 3 filed
- Mill Run: 2 active, 18 MW of 4 filed
- Gates Hill: none active of 2 filed
- Lardin: none active of 2 filed
- South Union: none active of 2 filed
- Yukon-Bethelboro: none active of 2 filed
Other PJM queue substations in Garrett County, MD
- Mount Storm - Pruntytown: 2 active, 231 MW of 2 filed
- Kelso Gap: 3 active, 126 MW of 3 filed
- Roth Rock: 1 active, 43.5 MW of 2 filed
- Albright-Cross School: none active of 2 filed
- Oakland-Gorman: none active of 2 filed