Home / PJM / substation / Lardin - Lake Lynn
Lardin - Lake Lynn substation interconnection queue
3 active projects
totalling 119 MW in the PJM queue.
3 active projects
119 active MW
3 total filed
Queue ID Project kV MW Resource Status
AH1-249
Poseidon Storage
138
80
Battery
Active
AH1-247
Poseidon Solar 1
138
24
Solar
Active
AH1-248
Poseidon Solar 2
138
15
Solar
Active
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.