Lardin - Lake Lynn substation interconnection queue

3 active projects totaling 119 MW in the PJM queue.

3 PJM queue filings name Lardin - Lake Lynn as the point of interconnection, all in Fayette County, PA.

Target commercial operation date as filed: Dec 2028 (3 filings). 3 active filings target a date after November 27, 2026.

Transmission owner as filed: APS (3 filings).

3active projects
119active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-249 Poseidon Storage 138 80 Battery Active Dec 2028
AH1-247 Poseidon Solar 1 138 24 Solar Active Dec 2028
AH1-248 Poseidon Solar 2 138 15 Solar Active Dec 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Fayette County, PA

All 56 PJM queue filings in Fayette County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first