Lardin - Lake Lynn substation interconnection queue
3 active projects totaling 119 MW in the PJM queue.
3 PJM queue filings name Lardin - Lake Lynn as the point of interconnection, all in Fayette County, PA.
Target commercial operation date as filed: Dec 2028 (3 filings). 3 active filings target a date after November 27, 2026.
Transmission owner as filed: APS (3 filings).
3active projects
119active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-249 | Poseidon Storage | 138 | 80 | Battery | Active | Dec 2028 |
| AH1-247 | Poseidon Solar 1 | 138 | 24 | Solar | Active | Dec 2028 |
| AH1-248 | Poseidon Solar 2 | 138 | 15 | Solar | Active | Dec 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Fayette County, PA
- Hatfield - Rhodes Lane: 3 active, 4,038 MW of 3 filed
- Black Oak - Hatfield: 3 active, 1,491.1 MW of 3 filed
- Ronco: 2 active, 665 MW of 3 filed
- Gans - South Union: 1 active, 200 MW of 2 filed
- Gans: 2 active, 98.1 MW of 4 filed
- Bethelboro: 1 active, 60 MW of 3 filed
- Mill Run: 2 active, 18 MW of 4 filed
- Gates Hill: none active of 2 filed
- Lardin: none active of 2 filed
- South Union: none active of 2 filed
- Yukon-Bethelboro: none active of 2 filed
Site Scanner