Substation Scout

Mill Run substation interconnection queue

2 active projects totalling 18 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
18active MW
4total filed
Queue IDProjectkVMWResourceStatus
B28_W08 Mill Run WF 25 15 Wind In Service
AE1-054 Mill Run 25kV 25 7.5 Battery Withdrawn
AD2-128 Mill Run 25 kV 25 3 Battery Withdrawn
K20 Mill Run WF 25 3 Wind In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.