Mill Run substation interconnection queue
2 active projects totalling 18 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
18active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| B28_W08 | Mill Run WF | 25 | 15 | Wind | In Service |
| AE1-054 | Mill Run 25kV | 25 | 7.5 | Battery | Withdrawn |
| AD2-128 | Mill Run 25 kV | 25 | 3 | Battery | Withdrawn |
| K20 | Mill Run WF | 25 | 3 | Wind | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.