Bethelboro substation interconnection queue

1 active project totalling 60 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
60active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH1-206 Lafayette Storage 138 60 Battery Active
AG1-142 North Union CSG 1 12.5 1.4 Solar Withdrawn
AF2-426 FA-Auto Auction 12.5 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.