Lardin substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Lardin as the point of interconnection, all in Fayette County, PA.

Target commercial operation dates as filed run from Dec 2023 to Sep 2024 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF2-274 FA-Rockwell 12.5 0 Hybrid Withdrawn Sep 2024
AG2-012 Lardin 12 kV 12 0 Solar Withdrawn Dec 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Fayette County, PA

All 56 PJM queue filings in Fayette County, PA.