Roth Rock substation interconnection queue

1 active project totalling 43.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
43.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1547 Roth Rock 138 kV 138 43.5 Battery Active
N29 Roth Rock 138kV 138 8 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.