Kelso Gap substation interconnection queue
3 active projects totaling 126 MW in the PJM queue.
3 PJM queue filings name Kelso Gap as the point of interconnection, all in Garrett County, MD.
Target commercial operation dates as filed run from Oct 2010 to Oct 2015 (3 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| H23_W70 | Kelso Gap WF | 138 | 100 | Wind | In Service | Oct 2010 |
| K28 | Kelso Gap WF | 138 | 20 | Wind | In Service | Oct 2010 |
| T16 | Fair Wind Project | 138 | 6 | Wind | In Service | Oct 2015 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Kelso Gap” in MD. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Kelso Gap: Expansion Tracker, PJM planning: APS state not printed
Other PJM queue substations in Garrett County, MD
- Black Oak - Hatfield: 3 active, 1,491.1 MW of 3 filed
- Mount Storm - Pruntytown: 2 active, 231 MW of 2 filed
- Roth Rock: 1 active, 43.5 MW of 2 filed
- Albright-Cross School: none active of 2 filed
- Oakland-Gorman: none active of 2 filed