Gans substation interconnection queue
2 active projects totaling 98.1 MW in the PJM queue, plus 2 with terminal status (shown grayed).
4 PJM queue filings name Gans as the point of interconnection, all in Fayette County, PA.
Target commercial operation dates as filed run from Dec 2001 to May 2027 (4 filings).
2active projects
98.1active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| B23_W04 | Gans 8 & 9 | 138 | 88 | Gas | In Service | Dec 2001 |
| AD2-109 | Gans 138kV | 138 | 12 | Gas | Withdrawn | May 2022 |
| N32 | South Chestnut WF | 138 | 10.1 | Wind | In Service | Dec 2011 |
| AG1-516 | Gans Energy CT and BESS | 138 | 4 | Battery | Withdrawn | May 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Fayette County, PA
- Hatfield - Rhodes Lane: 3 active, 4,038 MW of 3 filed
- Black Oak - Hatfield: 3 active, 1,491.1 MW of 3 filed
- Ronco: 2 active, 665 MW of 3 filed
- Gans - South Union: 1 active, 200 MW of 2 filed
- Lardin - Lake Lynn: 3 active, 119 MW of 3 filed
- Bethelboro: 1 active, 60 MW of 3 filed
- Mill Run: 2 active, 18 MW of 4 filed
- Gates Hill: none active of 2 filed
- Lardin: none active of 2 filed
- South Union: none active of 2 filed
- Yukon-Bethelboro: none active of 2 filed