Substation Scout

Gans substation interconnection queue

2 active projects totalling 98.1 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
98.1active MW
4total filed
Queue IDProjectkVMWResourceStatus
B23_W04 Gans 8 & 9 138 88 Gas In Service
AD2-109 Gans 138kV 138 12 Gas Withdrawn
N32 South Chestnut WF 138 10.1 Wind In Service
AG1-516 Gans Energy CT and BESS 138 4 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.