Substation Scout

Ronco substation interconnection queue

2 active projects totalling 665 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
665active MW
3total filed
Queue IDProjectkVMWResourceStatus
E17_W27 Ronco CT1, CT2, STG n/r 620 Gas In Service
AA2-139 Fayette Energy Facility 500 45 Gas In Service
AF2-029 Fayette Energy Facility 500 8 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.