Mount Storm - Pruntytown substation interconnection queue
2 active projects totaling 231 MW in the PJM queue.
Target commercial operation dates as filed run from Aug 2028 to Dec 2031 (2 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: APS (2 filings).
2active projects
231active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1725 | Mount Storm - Pruntytown 500 kV | 500 | 231 | Wind | Active | Dec 2031 |
| C01-1159 | Mount Storm - Pruntytown 500 kV | 500 | 0 | Battery | Active | Aug 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Preston County, WV
- North Longview: 2 active, 1,245 MW of 4 filed
- Afton: none active of 2 filed
- Albright: none active of 2 filed
- Garrett - Albright: none active of 2 filed
- Horse Shoe Run: none active of 2 filed
Other PJM queue substations in Garrett County, MD
- Black Oak - Hatfield: 3 active, 1,491.1 MW of 3 filed
- Kelso Gap: 3 active, 126 MW of 3 filed
- Roth Rock: 1 active, 43.5 MW of 2 filed
- Albright-Cross School: none active of 2 filed
- Oakland-Gorman: none active of 2 filed