Oakland-Gorman substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Oakland-Gorman as the point of interconnection, all in Garrett County, MD.

Target commercial operation date as filed: Jun 2022 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF2-112 Webb Solar 69 6.7 Solar Withdrawn Jun 2022
AG1-101 Oakland-Gorman 69 kV 69 6.7 Solar Withdrawn Jun 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Garrett County, MD

All 32 PJM queue filings in Garrett County, MD.