Oakland-Gorman substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Oakland-Gorman as the point of interconnection, all in Garrett County, MD.
Target commercial operation date as filed: Jun 2022 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-112 | Webb Solar | 69 | 6.7 | Solar | Withdrawn | Jun 2022 |
| AG1-101 | Oakland-Gorman 69 kV | 69 | 6.7 | Solar | Withdrawn | Jun 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Garrett County, MD
- Black Oak - Hatfield: 3 active, 1,491.1 MW of 3 filed
- Mount Storm - Pruntytown: 2 active, 231 MW of 2 filed
- Kelso Gap: 3 active, 126 MW of 3 filed
- Roth Rock: 1 active, 43.5 MW of 2 filed
- Albright-Cross School: none active of 2 filed