Albright-Cross School substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA2-020 | Albright-Cross School 138kV | 138 | 15 | Hydro | Withdrawn |
| AC2-021 | Albright-Cross School 138 kV | 138 | 15 | Hydro | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.