AXTON 765 kV
PJM queue ID C01-1931
AXTON 765 kV (C01-1931) is listed in the PJM interconnection queue as a 520 MW gas project in Henry County, VA. The filing names AXTON as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 15, 2029.
| Queue ID | C01-1931 |
|---|---|
| Project name | AXTON 765 kV |
| Status (as published) | Active |
| Substation | AXTON |
| Point of interconnection | AXTON 765 kV |
| County | Henry |
| State | VA |
| Voltage | 765 kV |
| Capacity | 520 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2029-04-15 |
| Source dataset | cycle |
Same substation and county
AXTON substation: 5 requests in the PJM queue, 2 active totaling 870 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-2108 | AXTON 765 kV | 350 | Battery | Active |
| C01-2109 | AXTON 765 kV | 650 | Gas | Withdrawn |
| C01-2110 | AXTON 765 kV | 650 | Gas | Withdrawn |
| C01-1714 | AXTON 765 kV | 520 | Gas | Withdrawn |
Henry, VA: 19 requests in the PJM queue, 7 active totaling 1,053.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | STACK Danville Gen Power 4, LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 520.0 |
| MW capacity | 520.0 |
| MFO | 520.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/23/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.