Smith Mountain substation interconnection queue

1 active project totaling 34 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Smith Mountain as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Dec 2018 to Jul 2031 (2 filings).

Transmission owner as filed: AEP (1 filing).

1active projects
34active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-311 Smith Mountain 138 kV 138 52.5 Battery Withdrawn Jul 2031
AA2-070 Smith Mountain Hydro 138 34 Hydro In Service Dec 2018

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Smith Mountain (AEP, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Same name on other Substation Scout pages

Other sources that print a substation named “Smith Mountain” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Bedford County, VA

All 8 PJM queue filings in Bedford County, VA.

Other PJM queue substations in Henry County, VA

All 19 PJM queue filings in Henry County, VA.