1 active project totalling 34 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
34active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG2-311 Smith Mountain 138 kV 138 52.5 Battery Withdrawn
AA2-070 Smith Mountain Hydro 138 34 Hydro In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.