Caden Energix Axton
PJM queue ID AE1-100
Caden Energix Axton (AE1-100) is listed in the PJM interconnection queue as a 41.9 MW solar project in Henry County, VA. The filing names Axton as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2023.
| Queue ID | AE1-100 |
|---|---|
| Project name | Caden Energix Axton |
| Status (as published) | In Service |
| Substation | Axton |
| Point of interconnection | Axton 138 kV |
| County | Henry |
| State | VA |
| Voltage | 138 kV |
| Capacity | 41.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2023-12-31 |
| Source dataset | serial |
Same substation and county
Axton substation: 7 requests in the PJM queue, 1 active totaling 41.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB2-145 | Axton 138kV | 572 | Gas | Withdrawn |
| AE1-121 | Axton 138 kV | 483 | Gas | Withdrawn |
| AE1-122 | Axton 138 kV | 483 | Gas | Withdrawn |
| AB2-146 | Axton 138kV | 382 | Gas | Withdrawn |
| AG2-414 | Axton 138 kV | 210 | Hybrid | Withdrawn |
| AD2-216 | Axton 138 kV | 43.9 | Solar | Withdrawn |
Henry, VA: 19 requests in the PJM queue, 7 active totaling 1,053.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 66 |
| MW capacity | 41.9 |
| MFO | 66 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.