Lynx substation interconnection queue

4 active projects totaling 363.4 MW in the ERCOT queue.

4 ERCOT queue filings name Lynx as the point of interconnection, all in TX.

Target commercial operation dates as filed run from Dec 2026 to Feb 2031 (4 filings). 4 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Nextera (2 filings), BRP Pictor BESS LLC (1 filing), Valentine Energy Center, LLC (1 filing).

4active projects
363.4active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
22INR0385 BRP Pictor BESS 138 201.1 Battery SS Completed, FIS Started, No IA Dec 2029
29INR0287 Valentine Energy Center 138 162.3 Gas SS Completed, FIS Started, No IA Feb 2031
18INR0079 Woodward I repower 138 0 Wind SS Completed, FIS Completed, IA Dec 2026
18INR0080 Woodward 2 repower 138 0 Wind SS Completed, FIS Completed, IA Dec 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Lynx” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other ERCOT queue substations in Crane County, TX

All 14 ERCOT queue filings in Crane County, TX.

Other ERCOT queue substations in Pecos County, TX

All 63 ERCOT queue filings in Pecos County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first