Tap TNMP White Baker ()–Bottlebrush() 345-kV double-circuit substation interconnection queue

3 active projects totalling 3,009.2 MW in the ERCOT queue.

3active projects
3,009.2active MW
3total filed
Queue IDProjectkVMWResourceStatus
31INR0019 Permian I Natural Gas n/r 1,247 Gas SS Completed, FIS Started, No IA
31INR0018 Permian I Solar n/r 1,125.7 Solar SS Completed, FIS Started, No IA
30INR0086 Permian I Wind n/r 636.5 Wind SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.