LEON_CRK substation interconnection queue

2 active projects totalling 401.4 MW in the ERCOT queue.

2active projects
401.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0620 st gall IIIA Storage 138 200.7 Battery SS Completed, FIS Started, No IA
27INR0621 st gall IIIB Storage 138 200.7 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.