BRP Pictor BESS (22INR0385) is listed in the ERCOT interconnection queue as a 201.1 MW battery project in Crane County, TX. The filing names Lynx as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2029. It records the screening study as complete on October 8, 2020.
| Queue ID | 22INR0385 |
|---|---|
| Project name | BRP Pictor BESS |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Lynx |
| Point of interconnection | 60400 Lynx 138kV |
| County | Crane |
| State | TX |
| Voltage | 138 kV |
| Capacity | 201.1 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-12-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Lynx substation: 4 requests in the ERCOT queue, 4 active totaling 363.4 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 29INR0287 | Valentine Energy Center | 162.3 | Gas | SS Completed, FIS Started, No IA |
| 18INR0079 | Woodward I repower | 0 | Wind | SS Completed, FIS Completed, IA |
| 18INR0080 | Woodward 2 repower | 0 | Wind | SS Completed, FIS Completed, IA |
Crane, TX: 14 requests in the ERCOT queue, 13 active totaling 2,944.5 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | BRP Pictor BESS LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2020-10-08 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.