Substation Scout

BRP Pictor BESS

ERCOT queue ID 22INR0385

BRP Pictor BESS (22INR0385) is listed in the ERCOT interconnection queue as a 201.1 MW battery project in Crane County, TX. The filing names Lynx as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2029. It records the screening study as complete on October 8, 2020.

Queue ID22INR0385
Project nameBRP Pictor BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationLynx
Point of interconnection60400 Lynx 138kV
CountyCrane
StateTX
Voltage138 kV
Capacity201.1 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Lynx substation: 4 requests in the ERCOT queue, 4 active totaling 363.4 MW.

Queue IDProjectMWResourceStatus
29INR0287Valentine Energy Center162.3GasSS Completed, FIS Started, No IA
18INR0079Woodward I repower0WindSS Completed, FIS Completed, IA
18INR0080Woodward 2 repower0WindSS Completed, FIS Completed, IA

Crane, TX: 14 requests in the ERCOT queue, 13 active totaling 2,944.5 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBRP Pictor BESS LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2020-10-08

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.