Substation Scout

Woodward 2 repower

ERCOT queue ID 18INR0080

Woodward 2 repower (18INR0080) is listed in the ERCOT interconnection queue as a wind request filed at 0 MW (a net change or energy-only filing) in Pecos County, TX. The filing names Lynx as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of December 31, 2026. It records the screening study as complete on June 19, 2018, the full interconnection study as approved on November 27, 2018 and the interconnection agreement as signed on December 18, 2018.

Queue ID18INR0080
Project nameWoodward 2 repower
Status (as published)SS Completed, FIS Completed, IA
SubstationLynx
Point of interconnection60400 Lynx 138kV
CountyPecos
StateTX
Voltage138 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2026-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Lynx substation: 4 requests in the ERCOT queue, 4 active totaling 363.4 MW.

Queue IDProjectMWResourceStatus
22INR0385BRP Pictor BESS201.1BatterySS Completed, FIS Started, No IA
29INR0287Valentine Energy Center162.3GasSS Completed, FIS Started, No IA
18INR0079Woodward I repower0WindSS Completed, FIS Completed, IA

Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityNextera
CDR reporting zoneWEST
Fuel codeWIN
Technology codeWT
Interconnection agreement signed2018-12-18
Screening study complete2018-06-19
Full interconnection study approved2018-11-27
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.