TNCENTRY1_1 substation interconnection queue

3 active projects totalling 756.2 MW in the ERCOT queue.

3active projects
756.2active MW
3total filed
Queue IDProjectkVMWResourceStatus
27INR0653 Rock House Draw Gas 138 523 Gas SS Started, FIS Started, No IA
24INR0452 Longfellow Solar I 138 178.2 Solar SS Completed, FIS Started, IA
24INR0453 Longfellow BESS I 138 55 Battery SS Completed, FIS Completed, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.