Substation Scout

TNCENTRY1_1 substation interconnection queue

3 active projects totaling 763.2 MW in the ERCOT queue.

3 ERCOT queue filings name TNCENTRY1_1 as the point of interconnection, all in Pecos County, TX.

Target commercial operation dates as filed run from Nov 2027 to Dec 2028 (3 filings). 3 active filings target a date after November 27, 2026.

Interconnecting entity as filed: CENTURY GAS PROCESSING, LLC (2 filings), Longfellow Power LLC (1 filing).

3active projects
763.2active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
27INR0653 Rock House Draw Gas 138 523 Gas SS Completed, FIS Started, No IA Nov 2027
24INR0452 Longfellow Solar I 138 185.2 Solar SS Completed, FIS Started, IA Dec 2028
24INR0453 Longfellow BESS I 138 55 Battery SS Completed, FIS Completed, IA Mar 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-11-0924INR0452Capacity revised+7 SS Completed, FIS Started, IA → SS Completed, FIS Started, IA
2026-10-0527INR0653Status changen/a SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA

Other ERCOT queue substations in Pecos County, TX

All 63 ERCOT queue filings in Pecos County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first