Substation Scout

Crane, TX interconnection queue

13 active projects totalling 2,944.5 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

13active projects
2,944.5active MW
14total filed
Queue IDProjectkVMWResourceStatus
26INR0188 Western Flats Storage 138 410.7 Battery SS Completed, FIS Started, No IA
26INR0110 Western Flats Solar 138 410.2 Solar SS Completed, FIS Started, No IA
29INR0013 Cattle Drive Solar 345 307 Solar SS Completed, FIS Started, IA
29INR0279 Tierra Loma Solar 345 250 Solar SS Completed, FIS Started, No IA
24INR0383 Soda Lake BESS 2 SLF 138 205.4 Battery SS Completed, FIS Started, No IA
28INR0389 Tri-X BESS 1 SLF 138 205.3 Battery SS Completed, FIS Started, No IA
23INR0501 Soda Lake BESS 1 138 203.9 Battery SS Completed, FIS Completed, IA
23INR0080 Soda Lake Solar 2 SLF 138 201.7 Solar SS Completed, FIS Started, IA
20INR0143 Tri-X Solar 1 SLF 138 201.5 Solar SS Completed, FIS Started, IA
22INR0385 BRP Pictor BESS 138 201.1 Battery SS Completed, FIS Started, No IA
29INR0280 Tierra Loma Storage 345 200 Battery SS Completed, FIS Started, No IA
19INR0017 Tri-County Solar n/r 177.8 Solar Inactive
23INR0074 BRP Ampato BESS 138 121.6 Battery SS Completed, FIS Started, No IA
23INR0308 Fowler Ranch Storage 138 26.1 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.