Substation Scout

Tap Coyanosa - Blair Lake Sub substation interconnection queue

2 active projects totalling 605.3 MW in the ERCOT queue.

2active projects
605.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0230 Titus Sienta Solar 138 501.9 Solar SS Completed, FIS Completed, No IA
27INR0202 Shallow Valley Storage 138 103.4 Battery SS Completed, FIS Completed, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.