860 GIRVINSW substation interconnection queue

3 active projects totaling 317 MW in the ERCOT queue.

3 ERCOT queue filings name 860 GIRVINSW as the point of interconnection, all in Pecos County, TX.

Target commercial operation dates as filed run from Apr 2029 to Jun 2029 (3 filings). 3 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Greasewood III LLC (1 filing), Marigold BESS LLC (1 filing), Greasewood II BESS LLC (1 filing).

3active projects
317active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
29INR0263 Whitethorn Solar Project 345 163.1 Solar SS Completed, FIS Started, No IA Apr 2029
29INR0324 Ashtrom Marigold BESS SLF 345 153.9 Battery SS Completed, FIS Started, No IA Apr 2029
26INR0715 Tierra Bonita BESS SLF 345 0 Battery SS Completed, FIS Started, No IA Jun 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-11-0929INR0324Status changen/a SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA
2026-10-0529INR0263New request163.1 Not reported → SS Completed, FIS Started, No IA

Other ERCOT queue substations in Pecos County, TX

All 63 ERCOT queue filings in Pecos County, TX.