Tap SOLSTICE - SANDLAKE_5 substation interconnection queue
4 active projects totaling 1,633.7 MW in the ERCOT queue.
4 ERCOT queue filings name Tap SOLSTICE - SANDLAKE_5 as the point of interconnection, all in TX.
Target commercial operation dates as filed run from Dec 2028 to Feb 2029 (4 filings). 4 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Glass Mountain Wind, LLC (2 filings), Glass Mountain Solar, LLC (2 filings).
4active projects
1,633.7active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 28INR0468 | Glass Mountain Wind 2 | 345 | 519.2 | Wind | SS Completed, FIS Started, No IA | Dec 2028 |
| 29INR0194 | Glass Mountain Wind 1 | 345 | 511.5 | Wind | SS Completed, FIS Started, No IA | Dec 2028 |
| 29INR0182 | Pecos Flats Solar II | 345 | 301.5 | Solar | SS Completed, FIS Started, No IA | Feb 2029 |
| 29INR0183 | Pecos Flats Solar III | 345 | 301.5 | Solar | SS Completed, FIS Started, No IA | Feb 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Reeves County, TX
- # Solstice Substation: 4 active, 2,707 MW of 4 filed
- TNCOYOTSPG1: 2 active, 313.5 MW of 2 filed
Other ERCOT queue substations in Pecos County, TX
- Tap TNMP White Baker–Bottlebrush 345-kV double-circuit: 3 active, 3,009.2 MW of 3 filed
- Tap Solstice - Bakersfield Double circuit line: 3 active, 3,008.3 MW of 3 filed
- Tap Solstice to Bottlebrush: 5 active, 1,513.2 MW of 5 filed
- TNCENTRY1_1: 3 active, 763.2 MW of 3 filed
- Tap Coyanosa - Blair Lake Sub: 2 active, 605.3 MW of 2 filed
- Tap # HOLIDAY SUB TNP - # SOAPTREE TNP: 2 active, 402.3 MW of 2 filed
- LEON_CRK: 2 active, 401.4 MW of 2 filed
- Lynx: 4 active, 363.4 MW of 4 filed
- 860 GIRVINSW: 3 active, 317 MW of 3 filed
- TNCENTRY2_1: 2 active, 303.6 MW of 2 filed