Substation Scout

Tap SOLSTICE - SANDLAKE_5 substation interconnection queue

4 active projects totaling 1,633.7 MW in the ERCOT queue.

4 ERCOT queue filings name Tap SOLSTICE - SANDLAKE_5 as the point of interconnection, all in TX.

Target commercial operation dates as filed run from Dec 2028 to Feb 2029 (4 filings). 4 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Glass Mountain Wind, LLC (2 filings), Glass Mountain Solar, LLC (2 filings).

4active projects
1,633.7active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
28INR0468 Glass Mountain Wind 2 345 519.2 Wind SS Completed, FIS Started, No IA Dec 2028
29INR0194 Glass Mountain Wind 1 345 511.5 Wind SS Completed, FIS Started, No IA Dec 2028
29INR0182 Pecos Flats Solar II 345 301.5 Solar SS Completed, FIS Started, No IA Feb 2029
29INR0183 Pecos Flats Solar III 345 301.5 Solar SS Completed, FIS Started, No IA Feb 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Reeves County, TX

All 27 ERCOT queue filings in Reeves County, TX.

Other ERCOT queue substations in Pecos County, TX

All 63 ERCOT queue filings in Pecos County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first