2 active projects totaling 402.3 MW in the ERCOT queue.

2 ERCOT queue filings name Tap # HOLIDAY SUB TNP - # SOAPTREE TNP as the point of interconnection, all in Pecos County, TX.

Target commercial operation date as filed: Oct 2027 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Wisdom Green Energy LLC (2 filings).

2active projects
402.3active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
27INR0438 Wisdom Solar SLF 138 299.4 Solar SS Completed, FIS Completed, IA Oct 2027
27INR0440 Wisdom BESS SLF 138 102.9 Battery SS Completed, FIS Completed, IA Oct 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-0527INR0438Status changen/a SS Completed, FIS Completed, No IA → SS Completed, FIS Completed, IA
2026-10-0527INR0440Status changen/a SS Completed, FIS Completed, No IA → SS Completed, FIS Completed, IA

Other ERCOT queue substations in Pecos County, TX

All 63 ERCOT queue filings in Pecos County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first