Substation Scout

Tap Solstice - Bakersfield Double circuit line substation interconnection queue

3 active projects totaling 3,008.3 MW in the ERCOT queue.

3 ERCOT queue filings name Tap Solstice - Bakersfield Double circuit line as the point of interconnection, all in Pecos County, TX.

Target commercial operation date as filed: Jun 2030 (3 filings). 3 active filings target a date after November 27, 2026.

Interconnecting entity as filed: S&S Renewables, LLC (3 filings).

3active projects
3,008.3active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
30INR0084 Gravitas I Natural Gas 345 1,247 Gas SS Completed, FIS Started, No IA Jun 2030
30INR0083 Gravitas I Solar 345 1,124.8 Solar SS Completed, FIS Started, No IA Jun 2030
30INR0085 Gravitas I Wind 345 636.5 Wind SS Completed, FIS Started, No IA Jun 2030

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Pecos County, TX

All 63 ERCOT queue filings in Pecos County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first