Substation Scout

Regions: PJM · ERCOT · Georgia · Arizona · Nevada · MISO · Kentucky · All regions

02Kentucky

Substation Expansion Tracker: Kentucky

The substations Kentucky's utilities describe as new, or as getting a new voltage or a larger yard, in the cases they file with the Kentucky Public Service Commission, with the words that mark each one and the county the case prints.

Why this exists

Kentucky is split between four planning regions. East Kentucky Power, Duke Energy Kentucky and Kentucky Power are in PJM, whose planning documents this tracker already reads; Big Rivers is in MISO; Louisville Gas and Electric and Kentucky Utilities, the state's largest utilities, are in no regional transmission organization at all, and the Tennessee Valley Authority supplies parts of western and southern Kentucky. What every regulated utility in the state shares is the Kentucky Public Service Commission: most new transmission needs a Certificate of Public Convenience and Necessity, and the application describes what the utility proposes to build and where.

This section reads those cases. It keeps a page for every named substation a case describes as new, and for every existing one described as getting a new voltage level or a larger yard, with the county where the case prints it.

13substations described as new
2expansions at existing substations
36PSC cases read
2026-11-13latest document dated

Source: Kentucky Public Service Commission case records (psc.ky.gov): 36 transmission and substation cases filed since 2022 read by hand, 20 documents cited. Latest document dated November 13, 2026; retrieved 2026-11-21; records reviewed by hand 2026-11-21.

Generation interconnection requests in the same footprint: LG&E and KU queue (annual snapshot) · PJM queue · MISO queue (annual snapshot) · TVA queue (annual snapshot).

Described as new

Every named substation or switching station a Kentucky PSC case describes as new or proposed, with the words that mark it and the county the case prints.

SubstationUtilityCountykVIn service (as printed)Described as new
Henderson Paper MillBig Rivers ElectricNot printed161Not printed“to the proposed Henderson Paper Mill Substation (Project C)”
The source calls it proposed — Commission final order, Case 2022-00012, p.4 (case 2022-00012)
South Henderson Switching StationBig Rivers ElectricHenderson161Not printed“the proposed South Henderson Switching Station (Project B), to be located on Toy Anthoston Road in Henderson County”
The source calls it proposed — Commission final order, Case 2022-00012, p.4 (case 2022-00012)
LittonDuke Energy KentuckyNot printed—Not printed“supplied from the planned new Litton substation”
The source calls it new — Duke Energy Kentucky application, Case 2024-00158, p.139 (case 2024-00158)
TurfwayDuke Energy OhioBoone138Not printed“the future Turfway Substation off Turfway Road in Florence, Kentucky”
The source calls it proposed — Siting Board final order, Case 2025-00228, p.4 (case 2025-00228)
Cooper CCGTEast Kentucky Power CooperativePulaski161Not printed“Constructing a new 161 kV substation in a breaker-and-a-half configuration (“Cooper CCGT Substation”)”
The source calls it new — East Kentucky Power Cooperative application, Case 2025-00311, p.43 (case 2025-00311)
Liberty RICEEast Kentucky Power CooperativeNot printed161Not printed“Constructing a new 161 kV Switching Station ("Liberty RICE Substation") along the Casey County- Liberty Junction 161 kV Line”
The source calls it new — East Kentucky Power Cooperative application, Case 2025-00311, p.43 (case 2025-00311)
Madison County Switching Station
see note
East Kentucky Power CooperativeNot printed69/138December 2026 (2024-00263 order; moved from December 2025)“EKPC proposes to build the Madison County Switching Station to address system protection and reliability concerns.”
The source describes building it — East Kentucky Power Cooperative application (part 1), Case 2022-00314, p.4 (case 2022-00314)
OrinocoKentucky PowerPike69fourth quarter of 2025 (expected, as printed in the application)“Construct Orinoco 69 kV Substation in Pike County, Kentucky”
The source describes building it — Commission final order, Case 2023-00040, p.1 (case 2023-00040)
RatliffKentucky PowerPike69third quarter of 2028 (Proposed Project, as printed)“Additionally, the Proposed Project will build a new Ratliff Substation in Pike County, Kentucky.”
The source calls it new — Kentucky Power application, Case 2026-00184, p.5 (case 2026-00184)
VenatorKentucky PowerBoyd765/345October 2028 (Koehler testimony, as printed)“The Venator Substation Project includes the construction of a new 765/345 kV substation in Boyd County, Kentucky.”
The source calls it new — Kentucky Power application, Case 2026-00324, p.11 (case 2026-00324)
Glendale IndustrialKentucky UtilitiesHardin138August 2023 (Ford's requested in-service date for electric service, as printed)“a new 138kV/24.7 kV substation to be called the Glendale Industrial Substation”
The source calls it new — Kentucky Utilities application, Case 2022-00066, p.3 (case 2022-00066)
Glendale SouthKentucky UtilitiesHardin345/138August 2023 (Ford's requested in-service date for electric service, as printed)“a new 345kV/138kV substation east of Glendale, Kentucky to be called the Glendale South Substation”
The source calls it new — Kentucky Utilities application, Case 2022-00066, p.3 (case 2022-00066)
Lake DreamlandSoutheastern Regional Transmission Planning (LG&E/KU section)Not printed138Not printed“from Cane Run Switching to the new Lake Dreamland 138 kV station”
The source calls it new — SERTP 2025 Regional Transmission Plan and Input Assumptions, p.58

Expanded at an existing substation

A new voltage level or a larger yard at a station that is already there. Highest voltage first.

SubstationUtilityExpansionkVAs described
AlcaldeKentucky UtilitiesNew or expanded yard345“KU constructs a 345 kV bus at the Alcalde substation and installs a 2nd Alcalde 345/161 kV transformer” — East Kentucky Power Cooperative application, Case 2025-00311, p.40 (case 2025-00311)
Henry ClayKentucky PowerNew voltage level69“Rebuild the Henry Clay Substation to 69kV standards.” — Kentucky Power application, Case 2026-00184, p.5 (case 2026-00184)

Read but not listed

Stations the cases name whose wording does not describe them as new or as a new yard or voltage. They get no page.

As printedDocumentWhy not listed
Hebron and Oakbrook substationsDuke Energy Kentucky application, Case 2024-00158Existing substations at the ends of the new Hebron - Oakbrook 138 kV circuit (built for 138 kV, operated at 69 kV); the case describes line work, not a new yard or voltage at either station.
EKPC Fawkes substation (Fawkes Expansion)Commission final order, Case 2022-00314The order says the work creates a new circuit breaker position for the 138 kV line and splits the existing 138 kV bus with a bus-tie breaker: breaker and bus-split work at an existing voltage.
Glover Creek Solar EKPC switching station (Case 2022-00356)The order says the line runs to EKPC's switching station that is located within the project boundary; not described as new and not named.
Hummingbird Solar EKPC switchyard (Case 2022-00272)The application describes a proposed 138 kV switchyard to be built and owned by EKPC, but neither the application nor the order names it.
Exie Solar 161 kV switchyard (Case 2025-00151)The application describes a new three-breaker 161 kV switchyard tapping EKPC's Summershade - Green County 161 kV line, but does not name it or say who will own it; its text layer interleaves two columns.
The New Industrial Substation will be constructed at the southern end of the project and would be the final termination Commission final order, Case 2022-00314Described as new, but the case gives it no station name ("New Industrial Substation" is a description).
Baker 765/345 kV substation yard expansionCommission final order, Case 2025-00335The order describes expanding the yard (about 640 by 185 feet) at the existing Baker Substation to relocate the existing reactors and install a new three-phase 765 kV reactor circuit breaker on the Baker-Broadford 765 kV line. No new voltage, line position or transformer; reactor and breaker work is not an expansion (Cases 2024-00283 and 2025-00335).
Dorton 138/46kV substationKentucky Power application, Case 2026-00184The application converts the Dorton - Burdine line to 69kV; the conversion of Dorton's 46kV bus to 69kV appears only in an exhibit table whose text layer interleaves columns, so there is no clean quote to cite. Dorton is in Letcher County.
Burdine 46/12kV substationKentucky Power application, Case 2026-00184"Convert the Burdine Substation to 69kV by replacing the distribution bank": a distribution transformer replacement, not a yard or bus.
Breaks substationKentucky Power application, Case 2026-00184Retirement of a 69/46kV transformer and 46kV equipment; Breaks already has a 69kV yard.
Draffin substationKentucky Power application, Case 2026-00184Retired and replaced by the new Ratliff Substation.
Belfry 46 kV substationCommission final order, Case 2023-00040Retired and replaced by the new Orinoco 69 kV Substation.
New Camp and Stone 69 kV substationsCommission final order, Case 2023-00040New Camp's 69 kV bus is rebuilt and a switch added; Stone gets a new 69 kV breaker and its 46 kV equipment is retired. Equipment work at existing voltages.
Thelma substationCommission final order, Case 2025-00346Transformer #1 replaced with a 138/69/46kV transformer plus risers and relays; a transformer replacement alone is not an expansion. Kenwood (switches) and Prestonsburg (capacitor relocation, circuit switcher) are equipment work.
to a new substation to be owned by Louisville Gas & Electric Company and Kentucky UtilitiesKentucky Municipal Energy Agency Siting Board application, Case 2024-00290A new substation to be owned by LG&E/KU for the KYMEA Energy Center I generating plant; the case prints no station name.

What an entry is

An entry is a substation name as the case documents print it. The documents are written as prose, so the records are made by hand. Each record quotes an application or an order and gives the page. Every time this section is rebuilt, each quote is checked again against the archived document, and a quote that is no longer on its page stops the build. The Commission's case list is checked every week, and a new transmission or substation case is flagged until someone has read it.

A substation is described as new only where the quote says so, describes building it, or calls it proposed. An expansion needs the quote to describe a new voltage level or a larger yard at a station that is already there. A new breaker, reactor or transformer on its own is not counted. Stations the cases name without describing them as new are listed under "Read but not listed", with the reason.

What this does not say

A case describes what a utility asked to build; where the Commission has ruled, the page says so. Substations that need no certificate, such as many distribution substations, do not appear in these cases, and a substation missing here may still be planned. Merchant solar projects' own collector substations are not listed. The reason given for a project is the utility's own description. Nothing here says what a project will do for a site.

Source

Case records of the Kentucky Public Service Commission, as posted at psc.ky.gov, and the Lake Dreamland station from the 2025 Southeastern Regional Transmission Planning report, which covers LG&E and KU. The records are public; this site is not affiliated with or reviewed by the Commission or any utility.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first