Substation Scout

Liberty RICE

In a case before the Kentucky Public Service Commission, “Liberty RICE generation interconnection (printed in the Case 2025-00311 transmission study)” (case 2025-00311). The station's utility: East Kentucky Power Cooperative.

Not printedcounty (not printed)
161kV as printed
EKPCutility
—in service, as printed

Described as new. The quoted wording calls this substation new. “Constructing a new 161 kV Switching Station ("Liberty RICE Substation") along the Casey County- Liberty Junction 161 kV Line” — East Kentucky Power Cooperative application, Case 2025-00311, p.43 (case 2025-00311)

Also printed as: Liberty RICE Substation

Note. The study attached to the application says the switching station interconnects EKPC's twelve reciprocating engines near the city of Liberty in Casey County (214 MW net), looping in the existing Casey County - Liberty Junction 161 kV line about 7.4 miles from Liberty Junction; estimated cost $12.00 million. It says Liberty RICE is planned to be operational by December 2028 (the plant).

Note. No county given: the study prints Casey County for the generating facility, not for the switching station on the line.

The case documents print no county for this substation, and none has been found printed for it elsewhere yet.

Source: Kentucky Public Service Commission case records (psc.ky.gov): 36 transmission and substation cases filed since 2022 read by hand, 20 documents cited. Latest document dated November 13, 2026; retrieved 2026-11-21; records reviewed by hand 2026-11-21.