Ratliff
In a case before the Kentucky Public Service Commission, “Breaks-Dorton Project (46kV to 69kV conversion)” (case 2026-00184). The station's utility: Kentucky Power.
Described as new. The quoted wording calls this substation new. “Additionally, the Proposed Project will build a new Ratliff Substation in Pike County, Kentucky.” — Kentucky Power application, Case 2026-00184, p.5 (case 2026-00184)
Also mentioned: “Retire the Draffin Substation and replace it with the greenfield Ratliff Substation.” — Kentucky Power application, Case 2026-00184, p.5 (case 2026-00184)
Note. The application says Ratliff replaces the Draffin 46/12kV substation as part of rebuilding the Breaks - Dorton 46kV circuit to 69kV standards (PJM baseline B3736 per the Koehler testimony).
Note. Pending as of 2026-11-21: filed 2026-09-11, no final order.
County: “Additionally, the Proposed Project will build a new Ratliff Substation in Pike County, Kentucky.” — Kentucky Power application, Case 2026-00184, p.5 (case 2026-00184).
Generation interconnection requests filed in Pike, KY: PJM queue, 2 active of 10. Same county, not the same substation.
Source: Kentucky Public Service Commission case records (psc.ky.gov): 36 transmission and substation cases filed since 2022 read by hand, 20 documents cited. Latest document dated November 13, 2026; retrieved 2026-11-21; records reviewed by hand 2026-11-21.
Before relying on any of this
- These are the substations named in Kentucky Public Service Commission cases since 2022: a utility files for a certificate when it builds most new transmission. Smaller substations, and projects that need no certificate, are not in these cases.
- A county is shown where the case prints it for the station; otherwise it is left blank.
- An application describes what a utility asks to build. Where the Commission has ruled, the page says so; an in-service date is the one the documents print, not a construction schedule.