In a case before the Kentucky Public Service Commission, “Cooper - Alcalde 161 kV double-circuit line (Cooper CCGT interconnection)” (case 2025-00311). The station's utility: East Kentucky Power Cooperative.

Pulaskicounty
161kV as printed
EKPCutility
—in service, as printed

Described as new. The quoted wording calls this substation new. “Constructing a new 161 kV substation in a breaker-and-a-half configuration (“Cooper CCGT Substation”)” — East Kentucky Power Cooperative application, Case 2025-00311, p.43 (case 2025-00311)

Also printed as: Cooper CCGT Substation

Also mentioned: “Both circuits of the line will connect at a new” — East Kentucky Power Cooperative application, Case 2025-00311, p.20 (case 2025-00311)

Note. The study attached to the application says the substation will be built adjacent to the existing Cooper Station 161 kV switchyard to connect EKPC's new 745-MW Cooper combined-cycle unit (761/789 MW net, approved in Case 2024-00370), with the existing Cooper-Laurel Dam and Cooper-Denny 161 kV lines re-terminated into it; estimated cost $25.00 million. The county quote is printed for the Cooper CCGT generating facility, which the substation serves at the same site.

Note. The study says the Cooper CCGT is planned to be operational by June 2030 (the plant, not the substation). The Commission granted the CPCN for the Cooper - Alcalde line on 2026-03-09.

County: “for a new two-on-one combined cycle gas turbine facility in Pulaski County, KY (Cooper CCGT)” — East Kentucky Power Cooperative application, Case 2025-00311, p.46 (case 2025-00311).

Source: Kentucky Public Service Commission case records (psc.ky.gov): 36 transmission and substation cases filed since 2022 read by hand, 20 documents cited. Latest document dated November 13, 2026; retrieved 2026-11-21; records reviewed by hand 2026-11-21.